Skip to content
Kingstanding Together

Transport (station, canal, road, tram) · City centre · c. 1970–2018

Paradise Circus

The gyratory on the west side of the Inner Ring Road, built over the Queensway tunnel. Madin’s Central Library stood on its island. It was dismantled from 2015 for the Paradise scheme and closed to general traffic in 2018.

LostSite redeveloped
Colour photograph of a concrete road tunnel portal under construction amid raw earthworks, with office blocks behind.
1969. John Ball (jlb2011.co.uk) via Wikimedia Commons · CC BY-SA 4.0

What was here?

A traffic gyratory on the western side of the Inner Ring Road, wrapped around an island that held John Madin’s Central Library and other 1970s buildings. The ring road’s through traffic ran underneath in the Queensway tunnel.

History

In 1969 the photographer John Ball recorded the Queensway tunnel half-built between Paradise Street and Easy Row. The tunnel and the circus above it were the last major pieces of the ring, which was first used by traffic all the way round on 4 January 1971. Madin’s Central Library opened in the middle of the circus in 1974.

Pedestrians reached the island by subways and stairs. By 2006 Keith Jordan found that a wide walkway had been built over the road towards Centenary Square, but elsewhere the original subways still dominated, and the area had a “run down and neglected air about it”.

Why it mattered

Paradise Circus put the city’s main library and music school on an island ringed by traffic. Its removal reconnected Chamberlain Square, Centenary Square and the new library on Broad Street.

Why it disappeared

Road building · Redevelopment

The Central Library was demolished in 2015–16 and the gyratory was taken apart for the Paradise office development and the Metro. The road, renamed Lyon Queensway, closed to general traffic in September 2018; the council planned to reopen it for buses, trams, taxis and cycles.

The same spot, then and now

Ordnance Survey map of 1888–1913 around Paradise Circus

1888–1913

Today’s streets around Paradise Circus

Today

Explore it on the full map
Old map: Ordnance Survey six-inch, reproduced with the permission of the National Library of Scotland (CC BY 4.0). Today: © OpenStreetMap contributors.

More pictures

  • A quiet multi-lane road leading towards civic buildings.
    The Civic Centre from Suffolk Street, 15 July 1974Chris Denny, 15 July 1974. Geograph via Wikimedia Commons · CC BY-SA 2.0
  • A concrete spiral staircase leading down to a road level.
    Spiral steps to Paradise Circus Queensway, 2 October 2012Andrew Hill, 2 October 2012. Geograph via Wikimedia Commons · CC BY-SA 2.0

What’s there now

What replaced it

The Paradise development (offices, hotel and a rebuilt Chamberlain Square) and Lyon Queensway, a bus, tram and taxi route.

What survives

The A38 Queensway tunnel beneath, which still carries through traffic.

Today

Paradise offices and Chamberlain Square; the Metro crosses Lyon Queensway between the Town Hall and Library stops.

Then and now

Then · 1969

Colour photograph of a concrete road tunnel portal under construction amid raw earthworks, with office blocks behind.
The partly built Queensway tunnel, 1969 — 1969. John Ball (jlb2011.co.uk) via Wikimedia Commons · CC BY-SA 4.0

Now · 12 December 2015

Closed urban road junction with barriers and concrete buildings.
Paradise Circus Queensway closed for roadworks — Roy Hughes, 12 December 2015. Geograph Britain and Ireland via Wikimedia Commons · CC BY-SA 2.0

Today

  • New office blocks rising on a building site in the city centre.
    Redevelopment of Paradise Circus, 26 September 2019Philip Halling, 26 September 2019. Geograph via Wikimedia Commons · CC BY-SA 2.0

Key dates

  1. 20 July 2013 — Ring road tunnels shut for repairsThe A38 St Chad’s and Queensway tunnels, the main surviving parts of the ring road, close for six weeks of essential repairs.
  2. September 2018 — Paradise Circus closes to general trafficParadise Circus, renamed Lyon Queensway, closes for the Metro and the Paradise redevelopment. Through traffic keeps using the A38 tunnel underneath.

The full timeline →

Share
Sources and further reading
Where the sources differ

No exact opening date has been found for the Paradise Circus gyratory itself. The Queen’s opening of the whole ring road on 7 April 1971 is often said to have included the Queensway tunnel, but this rests on newspaper reports not read here.

  1. The Inner Ring Road, Underpasses & Murals of Birmingham — Keith M. Jordan, Sutton Coldfield Local History Research Group, 2006. pp. 28–30
  2. Paradise Public Transport Improvement Scheme (consultation) — Birmingham City Council, Birmingham Be Heard, 2021
  3. Memorandum by Birmingham City Council (WTC 16), Walking in Towns and Cities inquiry — Birmingham City Council, House of Commons Environment, Transport and Regional Affairs Committee, HC 167, 2001
  4. The history behind Birmingham’s St Chad’s and Queensway tunnels — BBC News, BBC, 2013
Add to this record — a memory, photo or correction
Your own memories, or ones passed down in your family. If we publish it, it’s shown as your recollection — not as checked history.

Your email is only used to reply to you. Privacy policy.

Comments

Comments will load here.